FPS Pontoon Hire supplied two modular floating pontoon platforms at Beaufort Place, Cambridge, providing stable working areas over the River Cam for MEWP access alongside the building.

Repeat use of a proven access method
Beaufort Place has used pontoon-mounted MEWP access before. A previous case study from Building Transformation describes earlier façade works at the same property using MEWPs positioned on pontoons in the River Cam to avoid intrusive scaffolding. The current works are separate, and FPS Pontoon Hire is supplying the floating access solution for this project.
Two pontoons supporting MEWP access
For the current project, two pontoons are in use with MEWPs positioned on the floating platforms to reach the waterside elevations. This creates practical access to the building where conventional land-based access is restricted by the river.

The modular layout allows the working platforms to be configured around the site, required reach, loading and operating area. This type of solution can reduce the need for fixed scaffolding while still giving the project team controlled access from the water.
Floating access for façade and maintenance works
Pontoon-mounted access can be suitable for façade maintenance, cleaning, painting, inspection and repair work where a structure sits directly beside water. Each arrangement should be reviewed against the actual equipment, loads, water conditions, restraint and temporary works requirements.
Pontoon hire in Cambridge and across the UK
FPS Pontoon Hire provides modular floating access platforms for MEWPs, scaffold towers, bridge inspections, building maintenance and other difficult-access works across the UK. See our floating work platform hire service for more information on project configurations and access options.
If you need pontoon hire in Cambridge or a floating platform for MEWP access over water, contact FPS Pontoon Hire with the site location, proposed equipment and required working area. For sites where delivery or waterside access is constrained, see our difficult and restricted access pontoon installation guidance.
Historical reference: Building Transformation – MEWPs at Beaufort Place.




















