Project Overview
FPS Pontoon Hire received a Monday enquiry for a pontoon installation required at Canary Wharf by Wednesday.
The project formed part of a large residential development and required a temporary floating walkway to support concrete shuttering works beside the water.
Short-Notice Mobilisation
The restricted programme meant the platform had to be prepared, transported and installed within a short mobilisation window.
FPS supplied the modular walkway and coordinated the installation so the assembled system could be craned into position at the busy construction site.
Temporary Construction Access
Modular pontoons can provide temporary routes and working areas where waterside construction limits conventional access. Depending on the site, systems can be installed from the bank, assembled in the water or lifted into position as a planned operation.
For similar projects, see our Floating Walkways & Bridges and Floating Work Platforms.
The Outcome
The walkway was delivered and installed within the requested programme. FPS was subsequently commissioned to provide additional pontoon systems for a later phase of the development.
Helping a Short-Notice Installation
- Site address and delivery access
- Crane or lifting arrangements if the pontoon is to be lifted in
- Walkway length, width and connection points
- The date and time the access is needed
Related Services
Related Projects
- Southall Waterside – 150 m Floating Towpath Walkway
- Kampus Manchester – Canal-Side Pontoon Access
- View all Pontoon Hire Case Studies
Need a Short-Notice Pontoon Installation?
Tell us the site location, required date, proposed use, working area and any access or lifting constraints and our team can review a suitable temporary pontoon system.
Call 01253 921 352 or contact FPS Pontoon Hire to request a quotation.